Make the acceptance
criteria clear.

A planned workflow for requirements, engineering approvals, manufacturing and recorded release. The quotation defines the inspection and documentation scope for each order.

FROM ENQUIRY TO HANDOVER

A clear process.
An agreed result.

Drawing revisions, component selection and release responsibilities belong in the project record.

  1. Enquiry & requirements

    Capture the application, site information, quantity, required timing and technical requirements.

  2. Engineering & agreement

    Review drawings, component selection, quotation and acceptance criteria; obtain scope approval before release.

  3. Enclosure fabrication

    Fabricate the cabinet to approved drawings. Coordinate external finishing to the agreed specification.

  4. Component procurement

    Source technically suitable, approved components against the agreed bill of materials.

  5. Assembly & wiring

    Bring together the enclosure, busbar arrangement, component mounting and wiring to the released design.

  6. Inspection & testing

    Complete the mechanical and electrical checks defined for the ordered assembly and record the results.

  7. Documentation & dispatch

    Compile the agreed drawings, inspection records and handling information before release for dispatch.

  8. Agreed service support

    Define any installation, handover and after-sales responsibilities in the quotation and order scope.

RELEASE CONTROL

Approve the scope
before the build.

The order and approved drawing revision establish what may be manufactured. A drawing change requires review before it becomes the basis for a subsequent build. Inspection results and any open actions belong with the release records.

BUYER RESOURCES

See the structure
behind the promise.

Download the capability overview and inspect example formats for drawing control and inspection planning.

CAPABILITIES OVERVIEW

Capabilities overview

A two-page guide to the electrical range, machine services, fabricated products, solar installation and site support.

Download PDF

ILLUSTRATIVE TEMPLATE

Drawing register template

An unfilled format for tracking drawing references, revisions and review status.

Download PDF

ILLUSTRATIVE TEMPLATE

Inspection plan template

An example structure for agreeing checks and records before work; all results are unfilled.

Download PDF

Illustrative templates are not completed project records, test reports or evidence of certification. No inspections or approvals are represented as completed.

UNFILLED EXAMPLE FORMAT

Drawing register template

An unfilled format for tracking drawing references, revisions and review status.

Drawing referenceTitle / purposeRevisionReview statusApproval reference
[Reference][Drawing title][Revision]Awaiting reviewNot recorded
[Reference][Drawing title][Revision]Awaiting reviewNot recorded

Illustrative template only. No actual project, engineering approval or manufacturing release is represented. The order and approved drawing revision establish the release basis.

UNFILLED EXAMPLE FORMAT

Inspection plan template

An example structure for agreeing checks and records before work; all results are unfilled.

Review areaAcceptance basisRecord / responsibilityResult
Drawing and componentsReleased drawings and ordered scopeReference and reviewer to be definedNot performed
Workmanship and fitOrder-specific criteriaCheck and reviewer to be definedNot performed
Mechanical checksProject inspection planMethod and reviewer to be definedNot performed
Electrical checks, if applicableProject-specific requirementsChecks and responsible engineer to be definedNot performed
Documentation and releaseRequired drawing and inspection recordsRelease authority to be definedNot released

Illustrative template only, not a test report or evidence of certification. Final checks, methods, acceptance criteria and responsibilities are defined for each order.

DEFINE YOUR ACCEPTANCE NEEDS

Tell us which records your project needs.

Prepare an enquiry
Prepare an enquiry