OEM & JOB WORK
Your drawing.
A clear basis for every build.
For equipment manufacturers and engineering teams who need a repeatable supply arrangement. Define the drawing revision, material responsibility and inspection scope before the first build, then use that record as the basis for later orders.
APPLICATIONS TO DISCUSS
OEM & drawing-based job work
- Build-to-print sheet-metal parts and mounting components
- Custom cabinets and equipment enclosures
- Components and subassemblies within an agreed contract scope
OEM and job work use available capacity. Quantities, processes and schedules require review. Confidentiality and customer-supplied material arrangements are agreed before work; drawings can be attached to the enquiry email.
Prepare an OEM enquiryA CLEAR SUPPLY SCOPE
A repeat order starts with a controlled first order.
Keep the released drawing revision, material specification and acceptance criteria together. A subsequent change should be reviewed and approved before it becomes the basis for a new build.
BEFORE THE ORDER
What the quotation
will define.
Use the quotation to make responsibilities, deliverables and acceptance clear before work is released.
| Scope area | What is defined |
|---|---|
| Drawing control | Which documents and revisions define the build, and how changes are approved. |
| Material & bought-out items | GridOak-supplied and customer-supplied scope, traceability and handling responsibilities. |
| Manufacture | Parts, assemblies, finishing and any defined subcontract processes. |
| Inspection & release | Acceptance criteria, records, identification and release responsibilities. |
| Repeat supply | Order quantities, commercial assumptions, packaging and delivery requirements. |
DOCUMENTED HANDOVER
Know what comes
with the build.
The order specifies which records accompany the parts or assembly.
- Identified parts or subassemblies against the released revision
- Build and inspection records specified by the order
- Clear identification of any approved drawing changes
- Packaging and traceability requirements for repeat supply
Before you enquire.
Can GridOak work from our drawings and branding requirements?
Include the drawing set and any identification or customer-brand requirements in the enquiry. Feasibility, permissions, scope and acceptance requirements must be agreed before work.
Can we supply material or components?
Yes, as a proposal for technical and commercial review. The order should state responsibility for quantities, condition, traceability, handling and any shortages or nonconforming items.
How are drawing changes handled?
A change needs a clear revision reference and review before manufacture. The quotation and build records should identify the revision actually approved for the order.
START WITH THE REQUIREMENT