Distribution

Sub Distribution Boards (SDB / SMDB / sub-switchboards)

Sub distribution boards divide the main supply into defined groups of downstream circuits. They can serve a floor, production area or utility group, with circuit identification and protection arranged for the actual loads.

THE APPLICATION

Give each area a clear distribution point.

  • Floor and work-area distribution
  • Utility and equipment groups
  • Extensions to existing distribution systems
Prepare a SDB / SMDB / sub-switchboards enquiry
Process illustration ยท Actual configuration is project-specific

CONFIGURE THE ASSEMBLY

Options around
your requirement.

  • Incoming isolation and outgoing circuit arrangements
  • Circuit protection and residual-current requirements
  • Metering and local indication
  • Surface/floor mounting and entry layout as specified

The project specification defines electrical duty, enclosure requirements, component selection and acceptance. Published configurations and test evidence will relate to the actual supplied assembly.

SUPPLY & HANDOVER

Define the build
and the records.

Choose equipment supply, a defined installation package or coordinated project execution. The quotation records engineering, inspection and site responsibilities.

  • Circuit and terminal schedules
  • Agreed layout and schematic information
  • Inspection and functional check records
  • Identification and installation information
View sample document formats

Before you enquire.

Are SDB, SMDB and sub-switchboard separate products?

These names can overlap across project specifications. We keep them together and define the actual incomer, feeders and application in the quotation.

Can installation and commissioning be included?

Yes. State the project location, site interfaces and required handover. Installation and commissioning are separately identified in the quotation.

CONNECT THE SCOPE

Related products
and services.

Build a brief that includes the equipment, manufacturing and site interfaces your project needs.

START WITH YOUR REQUIREMENT

Start with the load, layout and operating requirement.

Prepare an enquiry
Prepare an enquiry