Motor & backup power

Motor Control Centre (MCC) and motor starters

An MCC groups the starting, protection and control requirements of several motors. The motor schedule and operating sequences establish the feeder types, local/remote controls and interfaces needed by operators and maintenance teams.

THE APPLICATION

Bring motor control into one organised assembly.

  • Production machinery and process lines
  • Pumps, fans and utility equipment
  • Grouped motor starting and control
Prepare a MCC enquiry
Process illustration ยท Actual configuration is project-specific

CONFIGURE THE ASSEMBLY

Options around
your requirement.

  • DOL and star-delta motor starters
  • Soft-starter and VFD feeder options
  • Local/remote operation and process interlocks
  • Fixed or draw-out arrangements where specified

The project specification defines electrical duty, enclosure requirements, component selection and acceptance. Published configurations and test evidence will relate to the actual supplied assembly.

SUPPLY & HANDOVER

Define the build
and the records.

Choose equipment supply, a defined installation package or coordinated project execution. The quotation records engineering, inspection and site responsibilities.

  • Motor feeder and component schedule
  • Released power and control schematics
  • Agreed sequence/functional check records
  • Terminal schedules and equipment identification
View sample document formats

Before you enquire.

Can the same MCC include different starting methods?

Yes. Each feeder can be selected for the motor and process requirement. Include starting duty and speed-control needs with the motor schedule.

Can installation and commissioning be included?

Yes. State the project location, site interfaces and required handover. Installation and commissioning are separately identified in the quotation.

CONNECT THE SCOPE

Related products
and services.

Build a brief that includes the equipment, manufacturing and site interfaces your project needs.

START WITH YOUR REQUIREMENT

Start with the load, layout and operating requirement.

Prepare an enquiry
Prepare an enquiry