Control & protection

Automatic Power Factor Control (APFC)

An APFC panel switches capacitor stages according to the engineered power-factor correction scheme. Load behaviour and harmonic conditions matter when selecting the stage arrangement and any reactor requirements.

THE APPLICATION

Match correction stages to the electrical system.

  • Industrial power-factor correction
  • Facilities with changing motor loads
  • Review and replacement of existing capacitor panels
Prepare a APFC enquiry
Process illustration ยท Actual configuration is project-specific

CONFIGURE THE ASSEMBLY

Options around
your requirement.

  • Stage arrangement and automatic controller selection
  • Contactor-based switching and control interfaces
  • Reactor requirements following system review
  • Ventilation, indication and maintenance access

The project specification defines electrical duty, enclosure requirements, component selection and acceptance. Published configurations and test evidence will relate to the actual supplied assembly.

SUPPLY & HANDOVER

Define the build
and the records.

Choose equipment supply, a defined installation package or coordinated project execution. The quotation records engineering, inspection and site responsibilities.

  • Approved stage and component schedule
  • Released power and control drawings
  • Agreed inspection/functional records
  • Operating and maintenance information
View sample document formats

Before you enquire.

Should every APFC panel use detuned reactors?

The selection depends on the system and harmonic conditions. Provide available measurements and load details so the correction scheme can be reviewed.

Can installation and commissioning be included?

Yes. State the project location, site interfaces and required handover. Installation and commissioning are separately identified in the quotation.

CONNECT THE SCOPE

Related products
and services.

Build a brief that includes the equipment, manufacturing and site interfaces your project needs.

START WITH YOUR REQUIREMENT

Start with the load, layout and operating requirement.

Prepare an enquiry
Prepare an enquiry